The City’s checklist covers interior demolition only: the application, plans showing the areas affected with existing and proposed layouts, and — where they apply — sealed structural plans, temporary supports and utility disconnect/capping plans.
Application & eligibility
Building permit application (PAP)
Core itemThe completed building permit application.
Official source (opens in new tab)
Plans & drawings
Floor plan, elevations, sections and details
Core itemDrawings needed for the interior demolition.
Official source (opens in new tab)Current code in effect noted (e.g. FBC 2023)
Core itemState the code edition.
Official source (opens in new tab)Scope of work defining demolished areas
Core itemWhich walls, floors or ceilings will be demolished.
Official source (opens in new tab)Existing layout drawing
Core itemThe current state of the interior.
Official source (opens in new tab)Proposed layout after demolition
Core itemHow the space will look after demolition.
Official source (opens in new tab)MEP utility disconnection / capping plan
Core itemWhere plumbing, gas and electrical will be disconnected or safely terminated.
Official source (opens in new tab)Cover sheet with disclosure statement and scope
Core itemPer the checklist note.
Official source (opens in new tab)
Conditional checks
Sealed structural plans for load-bearing changes
If applicableRequired for modifications to load-bearing walls or structural components. Note: structural review may exclude the project from Walk-Thru Express.
Official source (opens in new tab)Temporary support details
If applicableHow structural integrity is maintained during demolition, if applicable.
Official source (opens in new tab)
Official source: Interior demolition applicant checklist (PDF) (opens in new tab)